Eremothecium gossypii (Ashby et Nowell) Kurtzman (ATCC® 10895D-2)

Strain Designations: genomic DNA from NRRL Y-1056 (ATCC 10895)  /  Product Format: dried Total DNA: Approximately 2 µg in 1X Tris buffer

Permits and Restrictions

View Permits

Strain Designations genomic DNA from NRRL Y-1056 (ATCC 10895)
Biosafety Level 1
Product Format dried Total DNA: Approximately 2 µg in 1X Tris buffer
Type Strain no
Preceptrol® no
Genome Sequenced Strain

Yes

Comments
Genome sequencing strain (completed by Biozentrum, University of Basel, Switzerland).
This preparation of high molecular weight DNA is appropriae for use in the polymerase chain reaction (PCR)* process and other molecular biology applications. *The PCR process is covered by patents owned by Hoffmann-La Roche Inc. Use of the PCR process requires a license.
ATCC 10895 is also known as Ashbya gossypii.
Name of Depositor ATCC
Special Collection ATCC, DNA
Cross References

Nucleotide (GenBank) : AE016814 Ashbya gossypii (= Eremothecium gossypii) ATCC 10895 chromosome I, complete sequence.

Nucleotide (GenBank) : AE016815 Ashbya gossypii (= Eremothecium gossypii) ATCC 10895 chromosome II, complete sequence.

Nucleotide (GenBank) : AE016816 Ashbya gossypii (= Eremothecium gossypii) ATCC 10895 chromosome III, complete sequence.

Nucleotide (GenBank) : AE016817 Ashbya gossypii (= Eremothecium gossypii) ATCC 10895 chromosome IV, complete sequence.

Nucleotide (GenBank) : AE016818 Ashbya gossypii (= Eremothecium gossypii) ATCC 10895 chromosome V, complete sequence.

Nucleotide (GenBank) : AE016819 Ashbya gossypii (= Eremothecium gossypii) ATCC 10895 chromosome VI, complete sequence.

Nucleotide (GenBank) : AE016820 Ashbya gossypii (= Eremothecium gossypii) ATCC 10895 chromosome VII, complete sequence.

Notice: Necessary PermitsPermits

These permits may be required for shipping this product:

  • Customers located in the state of Hawaii will need to contact the Hawaii Department of Agriculture to determine if an Import Permit is required. A copy of the permit or documentation that a permit is not required must be sent to ATCC in advance of shipment.
Basic Documentation